Public Workshop #3 Held

The City of Bastrop hosted the third public workshop for the Camp Swift Joint Land Use Study (JLUS) on Wednesday, June 8, 2016 from 6:00 – 7:30 PM at the Bastrop Convention Center. The Draft JLUS was presented at this meeting, including maps showing the areas affected. The 35 attendees had an opportunity to ask questions and provide comments during the presentation.

The overall goal of the JLUS is to protect the viability of current and future missions at Camp Swift while accommodating growth, sustaining the economic health of the region, and protecting public health and safety.

Click here for the presentation.

For more information, please contact Melissa McCollum using the contact information on this page.

Camp Swift JLUS – Public Draft

The links below provide access to the Public Draft documents that make up the Camp Swift JLUS. These documents are being released on June 3, 2016 for public review and comment as part of a 30-day review period that will end on July 8, 2016.

The contact person for this project is Melissa McCollum, Planning and Development Director for the City of Bastrop. Comments may be mailed to her at Bastrop Planning and Development Department, 1311 Chestnut Street, Bastrop, TX 78602 or emailed to Ms. McCollum at This email address is being protected from spambots. You need JavaScript enabled to view it. no later than 11:59 PM on July 7, 2016. Comments may also be sent via FAX at 512-332-8849 by the same time and date noted.

In order to develop a plan that is responsive to local needs, input from the community is critical.

swift pd Click the image for the Public Draft JLUS Report.
This is the main JLUS Document and provides a summary of key findings; areas affected, and recommended options.
swift br Click the image for the Public Draft Background Report.
This document provides detailed information on existing conditions and compatibility issues, and is a supporting document to the main JLUS Report.

Click here for the comment sheet.
This file (provided in Microsoft Word) can be used to submit comments on the Public Draft JLUS and Background Report.

Welcome

Welcome to the Camp Swift Joint Land Use Study (JLUS) website. As this project evolves, this website will be your primary source for access to all materials related to the project. Use the menus located at the top of the page to obtain the information you need.

Project Overview. This menu provides access to background information on this project. Look here for frequently asked questions, a map of the Study Area, and the current Project Schedule.

Public Participation. Public input is a major component in the success of this project. Your input is critical in this planning process and the success of this project. The Public Participation section of this website will be updated regularly to include information about the committees working on this project and guide you to upcoming public workshops.

Resources. Need a copy of a file? Use this menu to view project materials. All materials prepared for workshops, reports, and draft and final documents will be posted here for your review.

Contact Us. Sometimes you cannot make it to a meeting; however, your input is still important to us. Use this menu to learn how to contact the Project Manager or use the Comments Tool to send us an e-mail.

Matrix color dgCopyright © 2015, Matrix Design Group, Inc.
This study was prepared under contract with the City of Bastrop, Texas, with financial support from the Office of Economic Adjustment, Department of Defense. The content reflects the views of the City of Bastrop and the other JLUS Partners and does not necessarily reflect the views of the Office of Economic Adjustment.